Your all-in-one solution
Your trusted partner for HVAC design, installation, maintenance, and repair.
Committed to sustainability
Sustainability is at the heart of everything we do.
24/7/365 contracted call outs
Rapid response whenever you need us most.
Honesty and integrity
Building trust through transparent practices.
Project Overview
This solar photovoltaic (PV) installation project involved the design, supply, and installation of a 40 kilowatts peak (kWp) solar panel system for a local climbing facility. The scope of work included all necessary components, such as a new inverter and all associated electrical cabling.
Key Deliverables
- Installation of solar panels on the facility’s roof
- Inverter Installation: Installation of a new inverter to convert DC power from the solar panels into AC power for the facility’s use.
- Electrical Cabling: Installation of all necessary DC and AC cabling to connect the solar panels to the inverter and the facility’s electrical system.
Project Summary
This project involved the installation of a 40kWp solar PV system at a local climbing facility in Ipswich. The installation included new solar panels, a suitable inverter, and all associated electrical cabling. The system is designed to help the climbing facility generate its own clean electricity, reducing its reliance on the grid and lowering its carbon footprint. The successful completion of this project demonstrates our ability to provide tailored solar solutions for local businesses, contributing to sustainable energy practices within the community.