North East Essex Co-operative Academy

Client

SEH French

Duration

21 months

Value

£547,000

Project Overview:

EPPH was appointed to undertake a full mechanical overhaul at North East Essex Co-operative Academy as part of an essential upgrade to the building’s aging infrastructure. The scope included a comprehensive replacement of the HVAC, plumbing, and ventilation systems to enhance energy efficiency, reliability, and overall performance across the facility.

The project required careful coordination within a live educational environment, with strict timelines to ensure minimal disruption to the school’s operations. The goal was to deliver a future-proof, high-performing mechanical system that aligns with modern standards and supports the long-term needs of the academy.

Key Deliverables:

  • Removed existing HVAC, plumbing, and ventilation systems
  • Safely isolated and stripped out all redundant services
  • Removed an outdated AC unit and server room air conditioning
  • Completed first-fix plumbing, including soils and wastes
  • Installed new hot and cold water pipework throughout the building
  • Prepared plant areas for the installation of boilers and cylinders
  • Completed second-fix plumbing
  • Installed new energy-efficient boilers and hot water cylinders
  • Fully insulated all mechanical pipework
  • Installed new sanitary ware
  • Carried out thorough system testing
  • Commissioned all mechanical services to ensure optimal performance

Summary:

This successful project marks the complete transformation of North East Essex Co-operative Academy’s mechanical systems. EPPH delivered a modern, reliable, and energy-efficient solution tailored to the unique demands of an educational environment. With all systems now fully commissioned and operational, the academy benefits from improved comfort, reduced maintenance, and long-term operational efficiency.