Your all-in-one solution
Your trusted partner for HVAC design, installation, maintenance, and repair.
Committed to sustainability
Sustainability is at the heart of everything we do.
24/7/365 contracted call outs
Rapid response whenever you need us most.
Honesty and integrity
Building trust through transparent practices.
Client
SEH French
Duration
21 months
Value
£547,000
Project Overview:
EPPH was appointed to undertake a full mechanical overhaul at North East Essex Co-operative Academy as part of an essential upgrade to the building’s aging infrastructure. The scope included a comprehensive replacement of the HVAC, plumbing, and ventilation systems to enhance energy efficiency, reliability, and overall performance across the facility.
The project required careful coordination within a live educational environment, with strict timelines to ensure minimal disruption to the school’s operations. The goal was to deliver a future-proof, high-performing mechanical system that aligns with modern standards and supports the long-term needs of the academy.
Key Deliverables:
- Removed existing HVAC, plumbing, and ventilation systems
- Safely isolated and stripped out all redundant services
- Removed an outdated AC unit and server room air conditioning
- Completed first-fix plumbing, including soils and wastes
- Installed new hot and cold water pipework throughout the building
- Prepared plant areas for the installation of boilers and cylinders
- Completed second-fix plumbing
- Installed new energy-efficient boilers and hot water cylinders
- Fully insulated all mechanical pipework
- Installed new sanitary ware
- Carried out thorough system testing
- Commissioned all mechanical services to ensure optimal performance
Summary:
This successful project marks the complete transformation of North East Essex Co-operative Academy’s mechanical systems. EPPH delivered a modern, reliable, and energy-efficient solution tailored to the unique demands of an educational environment. With all systems now fully commissioned and operational, the academy benefits from improved comfort, reduced maintenance, and long-term operational efficiency.


