Your all-in-one solution

Your trusted partner for HVAC design, installation, maintenance, and repair.

Committed to sustainability

Sustainability is at the heart of everything we do.

24/7/365 contracted call outs

Rapid response whenever you need us most.

Honesty and integrity

Building trust through transparent practices.

Telford

Client

Kier

Duration

12 weeks

Value

£100,000 +

Project Overview:

This project involves a comprehensive upgrade of the existing plant room, including the replacement of gas-fired boilers, installation of a new flue system, and the implementation of a modern Building Management System (BMS).

Key Deliverables:

  • Boiler Replacement: Removal of existing boilers and installation of new high-efficiency gas-fired boilers.
  • Flue System Installation: Installation of a new flue system compliant with current regulations.
  • Pipework Installation: Installation of new heating pipework, valves, and fittings.
  • Pump and Control System Installation: Installation of new pumps, valves, and a dosing pot for optimal system performance.
  • BMS Installation: Design, installation, and commissioning of a new BMS to control and monitor the heating system.
  • Gas Pipework Installation: Installation of new gas pipework, including testing and certification.
  • Calorifier Installation: Installation of new calorifiers for hot water supply.
  • System Commissioning: Commissioning of the entire system, including gas safety checks and BMS programming.
  • Flue System Installation: Installation of a high-quality flue system to ensure safe and efficient operation of the boilers.

Summary:

This project will significantly improve the efficiency and reliability of the heating system. The new equipment and controls will optimize energy consumption, reduce maintenance costs, and enhance overall system performance. The project will also ensure compliance with current regulations and safety standards.

Read More PPM Case Studies: