Client
Kier
Duration
10 Weeks
Value
£160K
Project Overview:
EPPH have recently carried out a plantroom upgrade at a probation hostel improving, reliability, energy efficiency, and long-term performance. The project has been carefully managed to ensure residents experience no disruption to their hot or cold water supply.
Key Deliverables:
- New Keston 55 boiler cascade system with plate heat exchanger
- Upgraded 4” gas solenoid and gas pipework
- Replaced hot water system with 2 Boss cylinders and 4 backup immersion heaters
- New Grundfos Magna1 pumps
- Complete distribution pipework replacement
- Installed boosted cold water tank and isolated loft tank
- New BMS control panel
- Electrical main upgrade to support new equipment
- Raised concrete floor for better drainage
- Temporary boiler used to maintain full water services during works
Summary:
This complex upgrade involved replacing major systems including boilers, pumps, pipework, and controls. A temporary external boiler kept services running throughout the works. The project has been delivered with strong coordination and minimal impact on residents.